Örnek İş Makinaları / Yedek Parça Sistemi

ÖRNEK İŞ MAKİNALARI / KOMATSU YEDEK PARÇA SİSTEMİ
| Liste Görünümü | Resimli Görünüm |
| No |
Parça No |
Parça Adı |
Miktar |
Seçenekler |
|---|
| |$1 | |
Hydraulic Tank |
1 |
|
| |$2 | |
Hydraulic Tank, 1 Attachment |
1 |
|
| |$3 | |
Main Control Valve |
1 |
|
| |$4 | |
Main Control Valve, with Provision for Breaker, Breaker Unit for Low Back Pressure |
1 |
|
| |$5 | |
Main Piston Pump |
1 |
|
| |$6 | |
Main Piston Pump |
1 |
|
| |$7 | |
Gear Pump |
1 |
|
| |$8 | |
Suction Piping |
1 |
|
| |$9 | |
Delivery Piping |
1 |
|
| |$10 | |
Oil Cooler Piping |
1 |
|
| |$11 | |
Return Piping |
1 |
|
| |$12 | |
Return Piping, 1 Attachment |
1 |
|
| |$13 | |
Drain Piping |
1 |
|
| |$14 | |
Boom Piping |
1 |
|
| |$15 | |
Arm and Bucket Piping |
1 |
|
| |$16 | |
Drift Preventive Valve Piping Less |
1 |
|
| |$17 | |
Drift Preventive Valve Piping, with Drift Preventive Valve, Boom |
1 |
|
| |$18 | |
Hose Burst Valve Line, Boom |
1 |
|
| |$19 | |
Hose Burst Valve Line, Boom and Arm |
1 |
|
| |$20 | |
Attachment Piping, with Breaker Unit for Low Back Pressure |
1 |
|
| |$21 | |
Travel Piping |
1 |
|
| |$22 | |
Swing Piping |
1 |
|
| |$23 | |
Fan Motor Piping |
1 |
|
| |$24 | |
O.L.S.S. Piping |
1 |
|
| |$25 | |
Solenoid Valve Piping |
1 |
|
| |$26 | |
Shuttle Valve Piping |
1 |
|
| |$27 | |
Proportional Pressure Control (PPC) Main Piping |
1 |
|
| |$28 | |
Proportional Pressure Control (PPC) Main Piping, 1 Attachment |
1 |
|
| |$29 | |
Proportional Pressure Control (PPC) Main Piping, Drift Preventive Valve, Boom and Arm |
1 |
|
| |$30 | |
Proportional Pressure Control (PPC) Main Piping, Drift Preventive Valve, Boom and Arm, 1 Attachment |
1 |
|